Site and structure
Country, city, facility type, affected area and whether the structure remains operational.
Site assessment
A useful preliminary review begins with observed conditions and available evidence. It does not replace site investigation, engineering assessment or a project-specific proposal.
Prepare your enquiry
Country, city, facility type, affected area and whether the structure remains operational.
Where movement, cracking, rocking, voiding or loss of support is visible, and when it was first noticed.
Relevant drawings, level surveys, investigation records and dated photographs. Sensitive records should only be shared through an approved channel.
Access, working hours, production restrictions, utilities, safety controls and known environmental constraints.
Email info@uretek.asia, contact Vietnam on WhatsApp +84 918 031 925, or contact Malaysia on WhatsApp +60 18 236 8078. Do not send sensitive or restricted files through ordinary email or WhatsApp.
Data-handling gate
The production enquiry route must collect only what is needed for an initial review and make the handling terms clear before submission. These controls are launch requirements, not statements that a process is already operational.
State why each field is needed, avoid optional profiling and keep file upload outside the first-contact form.
Present the approved privacy notice at the point of collection, including the responsible entity, intended use and an appropriate acknowledgement or consent mechanism.
Verify the receiving address, authorised recipients, transport protection, spam controls and least-privilege access before enabling submission.
Approve retention, deletion, correction, access-request and incident-escalation procedures, then test them against a non-sensitive submission.
Do not send by email or WhatsApp: personal identity documents, health or financial data, security credentials, confidential client records, restricted drawings or other sensitive files.
Assessment pathway