Review drawings, previous investigations, repair history, loading changes and dated reports. Record gaps and uncertain provenance.
Technical insights
Cracking, rocking slabs and uneven levels describe what can be observed. They do not, by themselves, identify why movement occurred or which response is suitable.
Start with the question
Similar surface symptoms can result from different mechanisms. A preliminary review should separate the affected element from the possible loss of support, then test the working hypotheses with evidence appropriate to the site.
This framework supports scoping and discussion. It does not replace site investigation, engineering assessment or project-specific design.
Evidence ladder
Review drawings, previous investigations, repair history, loading changes and dated reports. Record gaps and uncertain provenance.
Document levels, joints, cracking, rocking, water pathways, local constraints and patterns across the affected area.
Use proportionate testing to examine the leading hypotheses. The method and coverage should follow the decision that the evidence must support.
Establish baseline measurements, tolerances, review points and escalation rules before work where ongoing change could affect the decision.
Resource library
Guide 01 · Floors
Separate the observed floor response from the possible causes below it, then define the evidence needed before treatment.
Read the guide →Guide 02 · Foundations
Build a disciplined working hypothesis from movement patterns, site history, drainage, loading and ground information.
Read the guide →Guide 03 · Delivery
Define baselines, acceptance criteria, hold points and records before intervention starts—not after completion.
Read the guide →Guide 04 · Symptoms
Document crack patterns and related movement without treating appearance or width alone as a diagnosis.
Read the guide →Guide 05 · Investigation
Start with the decision and uncertainty, then choose methods capable of testing the leading hypotheses.
Read the guide →Guide 06 · Treatment
Clarify whether the objective is support restoration, level recovery, or both before defining the treatment scope.
Read the guide →Tools in context
Methods such as ground-penetrating radar can help identify contrasts and patterns beneath accessible surfaces. Interpretation depends on material properties, site conditions, equipment, survey design and correlation with known features or other evidence.
Outputs should be treated as interpreted evidence rather than a direct picture of every subsurface condition. Where the decision requires greater certainty, intrusive confirmation, survey control or specialist investigation may still be necessary.
Selection discipline
Next step
Prepare the site context, observed condition, records and operating constraints before discussing possible pathways.
Treatment and operations
Guide 07 · Comparison
Compare objectives, structural load paths, disruption, uncertainty and verification before choosing a pathway.
Read the guide →Guide 08 · Operations
Plan investigation and treatment around production, access, hygiene, utilities, safety and shutdown constraints.
Read the guide →Guide 09 · Water
Investigate water pathways and loss of ground together so that visible settlement is not treated in isolation.
Read the guide →Project FAQs
FAQ 10 · Assessment
Prepare site context, symptoms, drawings, loads, history, ground information and operating constraints for the first review.
Read the FAQ →FAQ 11 · Scope
Understand why treatment zones are evidence-led and why final quantities can depend on conditions encountered.
Read the FAQ →FAQ 12 · Outcomes
Separate workmanship, process controls and measurable outcomes from conditions outside the treatment scope.
Read the FAQ →GPR technical resource library
A cornerstone guide plus four focused modules covering survey planning, source-data integrity, processing controls, interpretation confidence, limitations, physical verification and defensible reporting. The complete library is also available in technical Vietnamese.
Featured ground-improvement resource
An engineering guide to system selection, ground-model inputs, representative field trials, production controls, spoil and movement risks, QA/QC and objective-specific acceptance evidence.